基于PERT图的LMRP集油罩深水井喷应急作业设计
分享到:

《中国安全生产科学技术》[ISSN:1673-193X/CN:11-5335/TB]

卷:
10
期数:
2014年2期
页码:
114-119
栏目:
职业安全卫生管理与技术
出版日期:
2014-02-28

文章信息/Info

Title:
PERTbased design of LMRP cap emergency operation for deepwater blowout
作者:
孟会行陈国明朱 渊赵倩琳李晶晶
(中国石油大学〈华东〉海洋油气装备与安全技术研究中心,山东 青岛 266580)
Author(s):
MENG Hui xingCHEN Guo mingZHU YuanZHAO Qian linLI Jing jing
(Centre for Offshore Engineering and Safety Technology, China University of Petroleum, Qingdao Shandong 266580, China
关键词:
PERTLMRP集油罩应急作业设计深水井喷
Keywords:
PERT LMRP cap emergency operation design deepwater blowout
分类号:
X937
DOI:
10.11731/j.issn.1673-193x.2014.02.019
文献标志码:
A
摘要:
底部隔水管总成(LMRP)集油罩可高效回收深水井喷海底漏油,为有效支持应急演练和事故现场救援的开展,基于计划评审技术(PERT)进行LMRP集油罩应急作业设计。面向1500m水深事故场景,将LMRP集油罩作业分为15项子作业并编制应急作业PERT图,计算LMRP集油罩应急作业在不同规定期限内的完成概率。结果表明:PERT图可直观定量描述深水井喷应急作业,得到LMRP集油罩作业关键路线总时长为575h并给出作业优化建议。LMRP集油罩作业在规定期限45、50、55、60、65、70h内完成的概率分别为00002、00174、02420、07580、09826和09998。随着规定期限时间延长,应急作业完成概率提高,且在关键路线总时长附近增长率最大。
Abstract:
LMRP cap technique can efficiently recover seabed oil spill from the deepwater blowout. PERT(Program Evaluation and Review Technique) was employed to design the emergency operation of LMRP cap. Based on the hypothetical 1500m water depth accident scenario, LMRP cap operation was divided into 15 sub jobs, and the PERT charts of LMRP cap emergency operation were presented. Meanwhile, the completion probability of LMRP cap operation within time limit was estimated. The results showed that the PERT chart can visually and quantitatively describe the deepwater blowout emergency operations. The critical path total duration of LMRP cap operation is 575h, and the process optimization recommendation is available. The completion probability of LMRP cap operation within time limit from 45 to 70(5h interval)are 00002, 00174, 02420, 07580, 09826, 09998, respectively. Along with the increase of time limit, the completion probability improves and the growth rate reaches the maximum valute nearby the critical path total duration.

参考文献/References:

[1] 薛鲁宁, 樊建春, 张来斌. 海上钻井井喷事故的蝴蝶结模型[J]. 中国安全生产科学技术, 2013,9(2):7983 XUE Luning, FAN Jianchun, ZHANG Laibin. Bowtie model for offshore drilling blowout accident[J]. Journal of Safety Science and Technology. 2013, 9(2): 7983
[2] 郭恒, 陈国明. 海洋钻井平台事故致因分析与评价指标研究[J]. 中国安全生产科学技术, 2012, 8(3): 108113 GUO Heng, CHEN Guoming. The accidentcausing analysis and evaluation indexes for offshore drilling platforms[J]. Journal of Safety Science and Technology. 2012, 8(3): 108113
[3] 魏超南, 陈国明. 深水地平线钻井平台井喷事故剖析与对策探讨[J]. 钻采工艺, 2012, 35(5): 1821 WEI Chaonan, CHEN Guoming. Analysis of the blowout on deepwater horizon rig and precaution discussion [J]. Drilling & Production Technology, 2012, 35(5): 1821
[4] 邓海发, 陈国明. 基于CFD的深水钻井溢油事故定量风险评估[J]. 安全与环境学报, 2012, 12(2): 233236 DENG Haifa, CHEN Guoming. CFDbased quantitative hazard assessment of oil spills in deepwater drilling[J]. Journal of Safety Environment, 2012, 12(2): 233236
[5] 刘景凯. BP墨西哥湾漏油事件应急处置与危机管理的启示[J]. 中国安全生产科学技术, 2011, 7(1): 8588 LIU Jingkai. The enlightenment by the emergency response and crisis management of BP oil spill in Mexico gulf[J]. Journal of Safety Science and Technology. 2011, 7(1): 8588
[6] Lubchenco J, McNutt M K, Dreyfus G, et al. Science in support of the Deepwater Horizon response[J]. Proceedings of the National Academy of Sciences of the United States of America, 2012, 109(50): 2021220221
[7] Osi L K. BP's Deepwater Horizon Oil Spill: Engineering Failures, Environmental & Economic Impact[D]. New York: The Cooper Union for the Advancement of Science and Art, 2011
[8] 尹邦堂, 李相方, 任美鹏, 等. 深水井喷顶部压井成功最小泵排量计算方法[J]. 中国安全生产科学技术, 2011, 7(11): 1419 YIN Bangtang , LI Xiangfang ,REN Meipeng, et al. Calculation method for the minimum pump displacement while topkill method is successful in deep water well control[J]. Journal of Safety Science and Technology. 2011, 7(11): 1419
[9] 孟会行, 陈国明, 朱渊, 等. 深水井喷应急技术分类及研究方向探讨[J]. 石油钻探技术, 2012, 40(6): 2732 MENG Huixing, CHEN Guoming, ZHU Yuan, et al. Classification and discussion on the direction of emergency technology for deepwater blowout[J]. Petroleum Drilling Techniques, 2012, 40(6): 2732
[10] BP. Deepwater Horizon containment and response: Harnessing capabilities and lessons learned[R]. London: 2010
[11] Mathews K J. Fluid Flow and Heat Transfer in the Top Hat Oil Recovery System[C]. Houston: 2012
[12] Azaron A, Ghomi S. Lower bound for the mean project completion time in dynamic PERT networks[J]. European Journal of Operational Research, 2008, 186(1): 120127
[13] 单友成, 周满红, 赵红. 模糊型计划评审技术在海洋结构建造工期估算中的应用[J]. 天津大学学报(社会科学版), 2009, 11(2): 120122 SHAN Youcheng,ZHOU Manhong,ZHAO Hong. Application of FPERT to evaluation of building period for ocean structure[J]. Journal of Tianjin University(Social Sciences), 2009, 11(2): 120122
[14] 徐炜华, 肖刚. “海洋之殇”——深水地平线事件引发的思考[J]. 中国海洋平台, 2011, 26(6): 68 XU Weihua, XIAO Gang. Thinking of the "Deepwater Horizon" event[J]. China Offshore Platform, 2011, 26(6): 68
[15] 胡运权, 郭耀煌. 运筹学教程[M]. 北京: 清华大学出版社, 2012〖FL)〗〖HJ〗〖HT〗〖ST〗〖WT〗

相似文献/References:

备注/Memo

备注/Memo:
国家安全生产监督管理总局2012年安全科技“四个一批”项目(2012-507),长江学者和创新团队发展计划(IRT1086),中央高校基本科研业务费专项资金资助项目(13CX05003A,12CX06066A)。
更新日期/Last Update: 2014-02-28