[1]GB/T 1820842005,地震现场工作 第4部分:灾害直接损失评估[S].2005.
[2]百度百科. 工业设备[EB/OL]. http://baike.baidu.com/view/1172607htm
[2013523].
[3]孙广芝,邢立强,江洲.固定资产分类与代码研究[J].世界标准化与质量管理,2008,(11):1620
SUN Guangzhi, XING Liqiang, JIANG Zhou. Study on fixed assets classification and codes [J]. World Standardization & Quality Management, 2008,(11):1620.
[4]张艳蕊, 龚友国. 地震波及周边近百家企业 芦山工业损失约27亿元[EB/OL]. http://finance.sina.com.cn/china/dfjj/20130423/003215239318shtml
[201361].
[5]苏经宇, 周锡元,樊水荣,等.计算楼层上设备地震作用的方法[J].地震工程与工程振动, 1990,10(2):6572
SU Jingyu, ZHOU Xiyuan, FAN Yongrong, et al. Practical calculating method for seismic force of floorsupported equipments [J]. Earthquake Engineering and Engineering Vibration, 1990,10(2):6572.
[6]宋伟,王勇,吴高林.地震后电气设备损坏及其诊断试验[J].电工技术2009,(2):24
SONG Wei, WANG Yong, WU Gaolin. Electrical equipment damage after earthquake and it's diagnosis experiment[J]. Electric Engineering,2009,(2):24.
[7]杨维国,徐国彬,张文革.工业设备的震害预测研究[J].中国安全科学学报,2000,10(5):6570
YANG Weiguo, XU Guobin, ZHANG Wenge. Study on the prediction of seismic hazard of industry equipment[J]. China Safety Science Journal, 2000,10(5):6570.
[8]孙增寿,李金修,陈淮.工业设备震害的概率预测方法研究[J].世界地震工程,1994,(2):4550
SUN Zengshou, LI Jinxiu, CHEN Huai. A probabilistic method of predicting earthquake damage in industry equipment [J]. World Information on Earthquake Engineering, 1994,(2):4550.
[9]刘晓静,王慧彦,李志伟,等.工业企业大震灾害下直接经济损失评估方法研究—基于财务会计资产项目[J].自然灾害学报,2012,(4):125131
LIU Xiaojing, WANG Huiyan, LI Zhiwei, et al. Study on estimation of earthquakedisaster direct economic losses for industrial enterprises:based on financial accounting method[J].Journal of Natural Disaster,2012,(4):125131 .
[10]于传聚.油田电力系统安全可靠性评价[M].北京:中国石化出版社,2002.〖FL)〗〖HJ〗〖HT〗〖ST〗〖WT〗